Piled Raft Foundation for a Residential Project in Gerrards Cross

Overview

Location:

Gerrards Cross

Type of Contractors:

Principal

Timeline:

1-2 months

Summary:

piled-raft-foundation-gerrards-cross.jpeg

1. Project Overview

• Location: Gerard’s Cross, United Kingdom

• Scope of Work: Construction of a piled raft foundation for a residential structure.

• Foundation Type: Piled raft foundation combining deep piles with a reinforced concrete raft for superior load-bearing capacity and stability.

• Objective: To ensure a robust, stable foundation suitable for challenging soil conditions and heavy structural loads.

2. Project Phases

Phase 1: Site Preparation and Piling

• Activities:

• Site excavation and preparation for piling.

• Install deep piles to transfer the building’s load to deeper, more stable soil layers.

• Challenges Addressed: Weak or inconsistent topsoil necessitated deep piling for load distribution.

Phase 2: Reinforcement and Formwork Installation

• Activities:

• Placement of reinforcement steel mesh across the pile caps.

• Timber formwork construction to outline the concrete raft slab shape.

• Image Evidence:

The second image shows the reinforcement steel mesh grid carefully laid out in the prepared foundation area.

Phase 3: Concrete Pouring and Raft Formation

• Activities:

• Pouring concrete over the reinforced mesh to form the raft slab, integrating the piles for a combined system.

• Ensuring a smooth and level concrete finish to support the superstructure.

• Image Evidence:

• The first image depicts the concrete pouring, where workers ensure compaction and leveling.

• The third image highlights the completed piled raft foundation, with a smooth, stepped concrete surface ready for further construction.

3. Challenges and Solutions

• Ground Conditions: Weak topsoil required deep piles to stabilize the foundation.

• Load-Bearing Needs: Combined use of piles and raft ensured even load distribution, reducing settlement risks.

• Weather Concerns: Steps were taken to manage wet weather conditions, including quick-curing concrete additives and efficient on-site workflows.

4. Final Outcome

The piled raft foundation was completed, offering enhanced stability and load-bearing capacity. The foundation ensures minimal settlement and long-term durability, even in challenging soil conditions.

• Key Achievements:

• Successfully integrated deep piles with a reinforced concrete raft system.

• Achieved a level and high-strength foundation surface prepared for the superstructure phase.

• Delivered the project efficiently, meeting both structural and design specifications.

Image Evidence:

The images collectively document each stage, from reinforcement installation to the final smooth concrete foundation.

piled-raft-foundation-gerrards-cross1.jpeg
piled-raft-foundation-gerrards-cross2.jpeg

CONTACT US

Email : office@piledraftfoundation.co.uk

Contact : 02034323215

Address : 167-169 Great Portland Street
5th Floor, London, W1W 5PF

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.